Including the machine time, anodizing and laser engraving - this is a two week process for parts to start coming out the back end in volume.
...we finalize everything this week. CanonEF mounts with confirmation numbers 107.x should start shipping 22 February; 108.x the following week. 109.x the first week in March.
We expect to have the final PCBs back tuesday of next week, and start shipping 29 February.
...first 50 units should be rolling off the production line next week. Knobs might not be available until the following week.
On Monday we should be able to start assembling 200 Canon lens mounts. I believe we will have all remaining materials in house by that date. Our production capability is about 50 units/day.
The final RED specific mechanical parts are being made in the next few days, so they should line up with shipments wearly next week.
[Responding to comment about "notifications of imminent delivery" on 3/31:] Still on target for this...
We will start shipping the middle of next week.
In the next few days parts will start rolling in volume.
The circuit boards for the knobs will be here friday morning. Knobs will be in production next week.
... nobody knows what I look like. :bleh:
I will be at the REDuser party situated between AquaVideo and ViewFactor Studios. It will be a hands on opportunity with a production mount on a RED camera, connected to a prototype knob and an HDMI monitor.
mi ammazzi
I wait for a pix in order to know who I can look after when you'll say that you have no notice on my 2nd order or it is necessary any sort of collimation. Count on that.I will be at the REDuser party situated between AquaVideo and ViewFactor Studios. It will be a hands on opportunity with a production mount on a RED camera, connected to a prototype knob and an HDMI monitor. This is the one time that I will be available to talk with customers... unless of course, somebody recognizes me on the floor of NAB... oh wait... nobody knows what I look like. :bleh:
The good news is parts arrived... ten sets.
The bad news... only minor. One surface that should have been scotchbrited (how we get that silky finish, oops let out a secret) wasn't, so these parts are functional but not cosmetically perfect.
The three empty holes in the right side view is where pins go to actuate the switches on the circuit board. These pins will be here tomorrow... which is when I will post more pictures and another update.
http://www.reduser.net/forum/attachment.php?attachmentid=4163&d=1207776001
http://www.reduser.net/forum/attachment.php?attachmentid=4164&d=1207776001
The collimation feature rocks... I will explain it with pictures tomorrow.
The good news is parts arrived... ten sets.
The bad news... these parts are functional but not cosmetically perfect.
So it's finally all coming together! :weight_lift:
Looking forward to seeing some more pictures. The mount actually looks very clean.