Welcome to our community

Be a part of something great, join today!

  • Hey all, just changed over the backend after 15 years I figured time to give it a bit of an update, its probably gonna be a bit weird for most of you and i am sure there is a few bugs to work out but it should kinda work the same as before... hopefully :)

Where in line are we and how manmy ordered?

Well hoping the AI is SO much faster to produce than the TI (it must be right?) that they ship out in a wave of at least 200-400...be AMAZING... but naturally Im going with thinking I'm in second wave (51022 here)

and praying I'm in first wave when hopefully they start contacting people on Thursday for confirmation of shipping info...

Ok, well I have the day off today so I'll try and put together a list of all the SO numbers posted in here. Try and get others from other threads and bring them here or post here.
 
Ok, well I have the day off today so I'll try and put together a list of all the SO numbers posted in here. Try and get others from other threads and bring them here or post here.

I was going to try and do it now via Google Docs then paste it here but the problem being that people have put their SO Numbers BUT not whether they are TI PL or AI Canon etc.

I don't think the SO numbers go up as just plain Scarlets do they? If they do I can start but it looked like they were split into TI PL orders and AI Canon orders (which I assume is also including the TI Canon mount in those SO numbers)

If I'm wrong the, guess I can get started...its like 6.30pm, got nothing else to do... :P

Whoever starts it, people can always help keep it up to date...
 
I was going to try and do it now via Google Docs then paste it here but the problem being that people have put their SO Numbers BUT not whether they are TI PL or AI Canon etc.

I don't think the SO numbers go up as just plain Scarlets do they? If they do I can start but it looked like they were split into TI PL orders and AI Canon orders (which I assume is also including the TI Canon mount in those SO numbers)

If I'm wrong the, guess I can get started...its like 6.30pm, got nothing else to do... :P

Whoever starts it, people can always help keep it up to date...
Right on well take it away then!
 
you should maybe add a column for european buyers, becausee it seems there will be some delay for us. it's getting more and more complex ^^
 


ahh!!started on it Gavin...damn...ok well I'll post mine here anyway, I'll split between known TI PL Mount and 'Rest' since PL Mount started shipping 17th and Canon is 1st



Ok so list:

https://docs.google.com/spreadsheet/ccc?key=0AmFjZbzXlMATdEdpZXZQM29reVFNN3BrRzROLWRuSVE

If your names on there, comment with your mount and I'll add that then split it so we have TI PL and AL Canon Mount...

If your name isn't on there... SO #5XXXX <--- I'm sure everyone knows the drill now :)

The other option, if you feel like it through your number in and/ your Mount type

Color Scheme: (since its in black)

Yellow: Notified
Orange: On Route (changeable)
Red: Delivered
 
you should add a "shipped" column.

Not sure if you mean me or Gavin

I figured Colour would be a better indicator

but...

I have added "Received Yes/No"

Guess we can do both! twice the confirmation...twice the happiness :smile:
 
S0-50947 Canon Al mount

What is a good guesstimate of manufactured Scarlets per day?

Well Gavin did an awesome forumla earlier in the thread

Since this is REDuser of course speculation is the name of the game. So here would be my equation for "when yours will be ready" (assuming everyone was Aluminum and there was no shortages).

Jim said they consistently can assemble an Epic in 13 minutes. 60/13 = 4.6 Cams per Hour = 37 per 8 hour day.

Safe to say that probably starting number is at a minimum 750.

Delivery Date = [(SO#-750)/37*1.4 per customer] Business Days after December 1.

=

So just plug in your SO

Mine is 1022

[(1022-750)/37*1.4 per customer] = 11

Around about 11 days (I rounded up) so 12th is my estimated...I'd plus around (this is personally though) 7 days to that just to be safe...since 12 is the optimistic, 7 days extra for some what realistic and beyond that is...well..."we miscalculated I guess?" region
 
so what # am I?
Order Number: 1111032241040593
Order Receipt Date: November 3, 2011
Order Total: $1,125.00

SCARLET-X w Ti Canon Mount / Side SSD DEPOSIT 1 $11,250.00 $1,125.00
Subtotal $1,125.00
Shipping TBD
Total Due Today $1,125.00
Estimated Balance* $10,125.00
*Due at time of shipment
 
Back
Top