Mark Pedersen
Well-known member
- Joined
- Aug 15, 2007
- Messages
- 1,246
- Reaction score
- 0
- Points
- 0
We are not in the 300's. We are not going to post a formal (or even informal) schedule, but I have stated in a few places that EVF production will, obviously, have to exceed RED ONE production to allow for the backorder to be bit in to. The gap has been narrowed and it will continue to do so. I think you all will be pleasantly surprised when you get your "Your EVF is ready" email as I think it will exceed the current expectations of the last few posts.
BC
Brent,
Agree that EVF production will need to exceed camera production in order to eliminate the backlog. But we seem to be at about 400 EVFs shipped, against probably 1500 to 1700 cameras shipped. According to Big John, you're ramping from a current production rate of 250 cameras per month to 500 per month in August. That would mean you'd have to be cranking out between 500-750 EVFs PER MONTH (assuming most owners ordered EVFs).
Is that the case? Given the run rates to date, that's a little hard to imagine.
So can you try to be a little less vague? As in, how many have shipped? What is your current run rate? How many EVFs are backordered against current camera numbers?
Or can you at least give us an estimated production run schedule so we can get a rough idea as to when to expect our EVF's?
Thanks,
M