David Quinn Carder
Well-known member
Epic #0008 ?
:smile5:
:biggrin:
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: this_feature_currently_requires_accessing_site_using_safari
Epic #0008 ?
:smile5:
Let's see what happens next.
Jim
So how long does it take to machine an Epic? a few weeks?
If it does they need a new machine! (or machine shop) Modern CNC machining centers are extremely fast. Go on YouTube to watch some examples and you will get a better idea.
In my previous life I founded and owned a machine shop specializing in laser and water jet cutting, CIM, Inc.. We also had a number of lathes and mills on the floor. Based on the images of Scarlets and Epics. I would estimate that the actual machining time of the six parts would be relatively minimal. After you include a fifteen minute setup time for each part on the machine, you could pump out over a half dozen sides per hour easily. In manufacturing, the need to outsource (powder coating, anodizing, etc) is usually the big hold up. Service suppliers have their own backlog to deal with. Red's volume is not sufficient to warrant a complete vertical integration, so they will always have that issue to deal with. But in IMHO the greatest time consumer for getting these babies out the door is the assembly and QC. Remember, this is not a Chevy their spitting out via long automated assembly lines.
...Nuclear reactor in a matchbox.
Jim
If it does they need a new machine! (or machine shop) Modern CNC machining centers are extremely fast. Go on YouTube to watch some examples and you will get a better idea.
For those of you that can't quite comprehend the complexity of what we are trying to do... consider that there are 70 boards and 11,000 pieces on an EPIC-X (with modules).
Just food for thought while you are waiting...
Jim
Wait, so if we disassemble an Epic brain and put it in a Delorean would we get a flux capacitor?
OK... back on topic. Mark gets 0007. Let's see what happens next.
Jim
Sorry if I was a bit vague in my estimation of machining time Jim. I meant that based on my twenty years of experience in this industry, I guessed that one of the six sides of the Epic shell should have a cycle time of about ten minutes on an average CNC Machining Center. So the CNC Mill could pump out about a half dozen parts per hour. I also based my guess on the assumption that whomever is doing the actual machining would run fifty to a hundred parts before changing over to another side of the Epic and then do the same there. Net machine time per Epic would then be well over an hour each.
And yes Jim, I was not including the mounting plates (PL, Canon, Nikon) in my estimate. Nor was I including any of the other items like modules, handles. They are additions to the total man hour estimates which would complete a fully functioning Epic-M.
I am sorry Jim, if my original post sounded simplistic toward your achievements. I have believed in you and your company from the start. Red 855 is a testament to the faith I have had in your company. If MBA schools around the world are not utilizing Red as a case study, they soon will be. What you have done to this industry and the manner in which you have accomplished it is ground breaking and I am honored to be a small part of it. Thanks to you and the whole Red Team.
yes, once Jim has completed this little EPIC project of his, let's put him to work on time travel...
it has become obvious that the major manufacturers of time travel devices have been withholding technologies and failing to give the consumers what they really want.