Tim Morten
Well-known member
- Joined
- Apr 27, 2008
- Messages
- 1,031
- Reaction score
- 0
- Points
- 0
A status update would be appreciated; I'm sure ACR is working hard. How many weeks until the next shipment?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: this_feature_currently_requires_accessing_site_using_safari
Hello,
we have finished tests of first batch of new electronic boards prototypes. We have encountered minor problems with some components on the new board so we have decided we need to replace them. We will receive second batch of new boards prototypes in middle of next week and we will commence final tests. If everything will be in order we will start building those electronics as production versions.
I will confirm shipping dates when I will receive green light from engineering department that new boards are ready for mass production.
Additional in response to feedback from The Beast users we have increased power output possible to receive from unit to 14.8V / 5A (from 12V / 5A, than means more than 20% power increase) - so powering RED and additional accessories will be possible without any problems.
Best
Peter
I bumped into a working BS4 on a shoot recently in London and had a chat with the operator. It was carrying an F55, RTMotion 3.1, Alphatron and TV Logic monitors. They were really pleased with it, having used the Movi and Ronin previously. He said they were mostly using it with an EasyRig and one of the Flowcine products. Had no idea about our trials and tribulations here! Anyway, I didn't get to play with it but it looked really nice and his glowing report was welcome![]()