Welcome to our community

Be a part of something great, join today!

  • Hey all, just changed over the backend after 15 years I figured time to give it a bit of an update, its probably gonna be a bit weird for most of you and i am sure there is a few bugs to work out but it should kinda work the same as before... hopefully :)

December deliveries...

Status
Not open for further replies.
We expect to get production up to 400 cameras for January and 500-600 February on. 700 units by May.

That is a rough schedule. We have been late in the past so we are hesitant to post a firm schedule and be late again. But this is what we are thinking- today.

Jim

Jim, what's happening in March and April ? I don't expect to be 2 months delay tho. I'm a little bit restless of the unsure schedule
 
Urgh - looks like I won't be able to pick up my camera in person AND fly to NAB at the same time.
 
We expect to get production up to 400 cameras for January and 500-600 February on. 700 units by May.

That is a rough schedule. We have been late in the past so we are hesitant to post a firm schedule and be late again. But this is what we are thinking- today.

Jim

So best case scenario, that would be:

#'s 200-600 delivered in January
#'s 600-1200 delivered in February
#'s 1200-1800 delivered in March
#'s 1800-2400 delivered in April
#'s 2400-3100 delivered in May
 
So best case scenario, that would be:

#'s 200-600 delivered in January
#'s 600-1200 delivered in February
#'s 1200-1800 delivered in March
#'s 1800-2400 delivered in April
#'s 2400-3100 delivered in May

This is very optimistic speculation :weight_lift:
If you look back they were always delays on the estimated delivery.
I would say: that the #2000 will be reached by May only.
Hope I am wrong...
 
So best case scenario, that would be:

#'s 200-600 delivered in January
#'s 600-1200 delivered in February
#'s 1200-1800 delivered in March
#'s 1800-2400 delivered in April
#'s 2400-3100 delivered in May

Since you are talking best case scenario.... you should start with 301-700 january and work from there, since "technically" it seems 101-300 are shipping before new years (for those who were home to check mail and had time to go to the bank...)

A revised BEST CASE scenario "let´s pray and HOPE shipping schedule" would then read:
#'s 301-600 delivered in January
#'s 701-1300 delivered in February
#'s 1301-1900 delivered in March
#'s 1901-2500 delivered in April
#'s 2501-3300 delivered in May
 
I wonder how all the primary 100 being re-gifted starting in January will affect the schedule? Another variable in the equation.
 
Since you are talking best case scenario.... you should start with 301-700 january and work from there, since "technically" it seems 101-300 are shipping before new years (for those who were home to check mail and had time to go to the bank...)

A revised BEST CASE scenario "let´s pray and HOPE shipping schedule" would then read:
#'s 301-600 delivered in January
#'s 701-1300 delivered in February
#'s 1301-1900 delivered in March
#'s 1901-2500 delivered in April
#'s 2501-3300 delivered in May

Seems 100 cameras got lost up there... :-)
Anyway, Jim said 400 cams are going to be out in January, and we start from #300 right? So, it means the first 100 replaced plus other 300 and we are up to #600 (and i'm fucked...)
 
We've got to be positive huh.. :innocent:

At this rate I'll get mine in 2010.. lol
 
Come on, #100-#300 aren't shipping in the next two days and it's not a payment issue, it's a logistics one. It's more like a few dozen cameras at best then #100-#300 will go out the first week or two of January.

The real question is how stable #1-100x and #100-300 turn out to be. If it's all rock solid then you'll see those other optimistic numbers come to fruitition.

I have 150% confidence in their work, so no slight against them, I just know that sometimes getting everything just right can take longer. Sometimes the last 20% takes 80% of the time, which really monkeys your deadlines...
 
It doesn´t really matter what anyone thinks (but it´s part of the fun), we will know soon enough, and the wait will be well worth it I am sure!

I am just adding to speculation.

(I thought I did state in my post that it was based on optimism gone extreme)
 
Come on, #100-#300 aren't shipping in the next two days and it's not a payment issue, it's a logistics one. It's more like a few dozen cameras at best then #100-#300 will go out the first week or two of January.

The real question is how stable #1-100x and #100-300 turn out to be. If it's all rock solid then you'll see those other optimistic numbers come to fruitition.

I have 150% confidence in their work, so slight against them, I just know that sometimes getting everything just right can take longer. Sometimes the last 20% takes 80% of the time, which really monkeys your deadlines...

Shawn thanks,

well said, well spoken and well thought out.
 
Thanks Sanjin, although I noticed a small typo in my original post, I meant NO slight against them. Sometimes the last 20% really does take 80% of the work. I've had this happen repeatedly in engineering projects I've been part of.

If Red is guilty of anything, it's over-optimism, and that's ultimately a good thing.
 
If they are up to #800 by the end of February, I'll be a very happy man.

:-)

Stephen
 
Come on, #100-#300 aren't shipping in the next two days and it's not a payment issue, it's a logistics one. It's more like a few dozen cameras at best then #100-#300 will go out the first week or two of January.

The real question is how stable #1-100x and #100-300 turn out to be. If it's all rock solid then you'll see those other optimistic numbers come to fruitition.

I have 150% confidence in their work, so no slight against them, I just know that sometimes getting everything just right can take longer. Sometimes the last 20% takes 80% of the time, which really monkeys your deadlines...

The cameras are lined up waiting for payment. Shipping is happening now...

Jim
 
The cameras are lined up waiting for payment. Shipping is happening now...

Jim

Excellent! Congrats, a fine way to end a year that has been miraculous!
 
Status
Not open for further replies.
Back
Top