Michael Hastings
Well-known member
- Joined
- Dec 29, 2006
- Messages
- 4,191
- Reaction score
- 21
- Points
- 38
- Location
- Florida
- Website
- www.aquavideo.com
.
.. especially given the way RED has kept us in the loop even at times of super high stress.
Mark.
RED has 13 people who, because they had virtually no product to ship, (and even now don't actually make these things) could spend a lot of their time "keeping us in the loop". Further, if more was out there about some of the behind the scenes stuff, you might not feel that you were really in the loop.
Doug Underdahl created a working Nikon mount that fits into the new adjustable pl mount in a matter of days. (As I suggested earlier could be done, since a dumb mount is just not that hard.)
http://www.youtube.com/user/dlunderdahl
So why has it taken RED months? They designed the new pl mount in October or November for shipments in December. That's at least 3 or 4 months that they have know the exact design parameters, and still more than two months since they had working cameras with the mounts. Yet it took Doug a couple of days? WTF??? Act 3 Scene 2: street dealer opens his trench coat and says: "Can I interest you in an 18-50 PL?":sarcasm:
I don't want to trash RED - love my camera. And I too get a little anxious when I call Erik and his voicemail is full like it was monday.
But I also know what it is like to be a micro manufacturer (and L&M, Amphibico, Gates, etc. are in the same boat - there aren't any big U/W manufacturers - even Ikelite is a tiny business by normal standards.) It is hard sometimes to get product out on schedule when you not only have to make the stuff, but answer the phone/emails because there is only one person that has the technical expertise when a major motion picture producer calls and wants 14 housings in 3 different configurations with fiber optic control interface; and another major company wants to buy 3 RED housings but again with special configuration and $20K worth of underwater connectors which have to spec'd and quotes obtained from the U/W connector company; and 2 other potential customers want info on 2 different new Sony cameras that nobody has made housings for yet. And spend three hours to try to track down the USPS lost package, and then get RED to help with a slightly longer LCD cable, so we can actually finish the external LCD case, and get it out and get paid and blah, blah, blah, blah, and this is all just the past few weeks. And I have another major motion picture company with a special project - that I haven't even responded because it involves an NDA that I have to modify. And I haven't sent Camdiver a specific quote because of the landslide of other stuff (and because the basics have been posted - so it is out there), but may lose that one just because of poor response.
This kind of pileup doesn't happen all the time, but it does happen - with no predictable pattern - several times a year. And I know it is the same for Birger - RED isn't the only thing he has going on.
EDIT: Just spoke to Erik at 12:11 EST and he said he has some firm dates for parts as well as a couple cool new features, one which I have been asking for specifically re: the underwater housing but also useful for everyone else (there's a whole thread dedicated to it); and the second that has nothing to do with underwater but is a VERY nice addition for everyone - but I will let him announce those to you probably in a post later today or tomorrow.