Andrew Martin
Well-known member
- Joined
- Feb 28, 2008
- Messages
- 457
- Reaction score
- 0
- Points
- 0
- Location
- London
- Website
- www.entitledproductions.com
I shot for a full day in London a couple of weeks ago, the drive got down to 10% left and i got dropped frames, first time ever on my drive so its possible for it to happen when the media gets full.
I did a 2 hour take before which was fine on the day (camera was super hot after but that was fine) but it was in the post where i had my problems, I couldnt load the R3d files in to anything Red Alert or Cine and it crashed my my Mac Pro each time i tried, that could be my machine and i ended up only using the proxies, but i wont be doing long takes again.
So it seems mixed. Would like to know how the guys with the long takes processed their footage.
Andrew
I did a 2 hour take before which was fine on the day (camera was super hot after but that was fine) but it was in the post where i had my problems, I couldnt load the R3d files in to anything Red Alert or Cine and it crashed my my Mac Pro each time i tried, that could be my machine and i ended up only using the proxies, but i wont be doing long takes again.
So it seems mixed. Would like to know how the guys with the long takes processed their footage.
Andrew