David Kellermann
Well-known member
- Joined
- May 19, 2009
- Messages
- 1,076
- Reaction score
- 0
- Points
- 36
- Location
- Freiburg, Germany
- Website
- www.abt-cine.de
I started a thread some weeks ago about a group buy of the Chinese Laing M02.
A lot of things happened, and the group buy for the Laing is still on (more or less), but there's also a different offer for a more professional system. Have a look at the thread, my blog or contact me via pm, if you have any questions.
I opened this thread to gather all the information, since people wrote me that it's really hard to find them in those über long threads.
Deadline is March 28th. You'll need a password to see the price and more details on my blog. Send me a pm or an email, and I'll send it to you immediately.
I do not work for ProLine, nor do I have any financial interest in them!
You can find more info on their website or their facebook page.
Here are some photos and data of the ProLine T2000 rig. And it's waaay cheaper than on their website.
Sled, arm and vest use industry standard conenctors, so it's easy to upgrade to a better vest or a different arm!
1x Full T2000 Sled comprised of
1x Aluminum Vest
1x T2000 Arm with 2 sets of caliper springs (0.45kg to 20,4kg / 1lb to 45lbs payload)
1x Auto-Lock Docking Port
2x 15mm Rods for wireless focus and accessories.
4x 12v and 1x 24 volt power cables (including special RED or BMC power cable)
2 years warranty for the full gear
Features
arm completely cnc machined
custom made 6pin LEMO power cables for the RED one and Epic / Scarlet are included
12 / 24V for RED and film cameras
arm and Sled made in Argentina and the US
possibility to pay via monthly installments (only US)
low mode
cables can be run through the pole, so it's an open system
classic spring system
vest is made in India, but modified in US to fit industry standard
2 years warranty
fly case not included (150USD for the case)
Update March 3 2013
WE DID IT
arty:
Luciano just wrote me a mail:
Estimated time frame for delivery is between 45 to maximum 60 days from today.
A lot of things happened, and the group buy for the Laing is still on (more or less), but there's also a different offer for a more professional system. Have a look at the thread, my blog or contact me via pm, if you have any questions.
I opened this thread to gather all the information, since people wrote me that it's really hard to find them in those über long threads.
Deadline is March 28th. You'll need a password to see the price and more details on my blog. Send me a pm or an email, and I'll send it to you immediately.
I do not work for ProLine, nor do I have any financial interest in them!
You can find more info on their website or their facebook page.
Here are some photos and data of the ProLine T2000 rig. And it's waaay cheaper than on their website.
Sled, arm and vest use industry standard conenctors, so it's easy to upgrade to a better vest or a different arm!
1x Full T2000 Sled comprised of
- topstage
- j box with LEMO / HD-SDI conenctors
- gimbal
- monitor and battery brackets
- d-box with LEMO / HD-SDI conenctors
- 3x AB Anton Bauer or V mount battery plates
- 2" carbon fiber super-post
1x Aluminum Vest
1x T2000 Arm with 2 sets of caliper springs (0.45kg to 20,4kg / 1lb to 45lbs payload)
1x Auto-Lock Docking Port
2x 15mm Rods for wireless focus and accessories.
4x 12v and 1x 24 volt power cables (including special RED or BMC power cable)
2 years warranty for the full gear
Features
arm completely cnc machined
custom made 6pin LEMO power cables for the RED one and Epic / Scarlet are included
12 / 24V for RED and film cameras
arm and Sled made in Argentina and the US
possibility to pay via monthly installments (only US)
low mode
cables can be run through the pole, so it's an open system
classic spring system
vest is made in India, but modified in US to fit industry standard
2 years warranty
fly case not included (150USD for the case)
Update March 3 2013
WE DID IT
Luciano just wrote me a mail:
Yes, we have more than 40 buyers already. [...] The Facebook group idea is great. Now we have to start the production. I have some cool ideas for the special edition, but those are a surprise.
I will close the store page today and will start posting news about the production soon. Buyers can then enter [the information page] with the same password.
Estimated time frame for delivery is between 45 to maximum 60 days from today.