Welcome to our community

Be a part of something great, join today!

  • Hey all, just changed over the backend after 15 years I figured time to give it a bit of an update, its probably gonna be a bit weird for most of you and i am sure there is a few bugs to work out but it should kinda work the same as before... hopefully :)

Module Ship Dates....

My buddy in San Jose has had a Canon Ti, Side handle (IIRC) for quite a while and expects his Epic-X tomorrow, again IIRC.

I have nothing, but do have a tracking number for my Stage-II kit, X, RedVolts x2, Travel Charger and Ti PL mount, for a total of 20Lbs.

I have another tracking number for something that weighs 3.5Lbs :). Not sure what it is though :) I am guessing the side Handle, but I do not think it weighs that much!!
 
I got the "Allocation" email over a week ago, and an as-of-yet undeclared/invoiced shipping notice that weighs 3.5Lbs :) I hope that is the allocated Side Handle!!

That explains some things.
 
I have an Epic M package that I ordered on 29th Sept, with a Bomb EVF
I'm still missing the DSMC Side Handle and Canon Mount, and the way it looks I don't think I'll see them before Xmas. With the earlier announcements I was hoping to be shooting in Malaysia and Thailand over Dec, but right now I have a camera that don't fit any of the glass I own, facing the immense cost of hiring PL glass and FF units for two weeks, and waiting in vain for my Bomb Squad rep to return my emails or calls.
 
Do we know the price of the 9" LCD yet?
 
Would be good to get all the info in one sticky thread as its crazy having to go fish for information on this forum.
As far as I know the last information about modules was on the 8th November 2011 so who knows what is up these days and what the tech details are of the ProIO or 9" LCD
Could someone from RED please turn on a light :)
 
Any update on the quad charger? I have 6 Redvolts that take all day to charge with that single charger, lol

+1
+10
+several thousand by now

would love to know about
Pro I/O - Shipping begins in January
9" LCD - Shipping begins in January
Dual REDVOLT module - Mid December
Quad REDVOLT charger - End November

need an injection of UPDATE straight to my brain NOW!
 
need an injection of UPDATE straight to my brain NOW!

Got an update a couple of days ago.

Ok.. time for an update :)

PRO/IO - Production tooling finally kicked off. Still needs FCC certification when it comes out of fab, which means Likely April.

Quad Battery module - slipped a bit.. Starts to ship mid January.

Quad Charger - Begins shipping January 14th :)
 
so it seems there's no D-Tap or Aux power on the battery module... hmmm, how do we power a Cube or a radio focus then? or will there be something on the I/O module? What's the plan?

What if I wanted to get a DUAL Battery module, could I swap a QUAD that is a part of the Stage 2 package for a DUAL?
could someone please clarify, someone from RED preferably :) thanks
 
Back
Top