randomacronym
New member
- Joined
- Jan 4, 2008
- Messages
- 4
- Reaction score
- 0
- Points
- 0
- Age
- 42
forgive me if its been asked before...I searched but the raw number of posts makes it hard to do an accurate search. If I were to place a deposit down next month, and the production schedule is upped (not delayed) and I find I need another month or two to get the funds avalible, is it possible to delay my shipment until the funds are ready (assuming a reasonable grace period, not keeping it on hold for 6 months, more like 2-3 max)
Its a sticky situation, I know I need one by a certain date, and to get it I must reserve soon, but I also know the funds are going to be in at an unknown point, months before its needed, but possibly after my number comes up. Is there a way to work it so I can get the camera even if funds are slow, without loosing my number and starting all over again. All this is complicated by the fact I won't know where I fit until I place my deposit. I know once the deposit is down, I won't be asking for a refund (unless production is severly delayed...at which point I am renting) but I don't know for sure when the funds will be avalible...politics I won't go into.
Any words of advice or comfort?
Its a sticky situation, I know I need one by a certain date, and to get it I must reserve soon, but I also know the funds are going to be in at an unknown point, months before its needed, but possibly after my number comes up. Is there a way to work it so I can get the camera even if funds are slow, without loosing my number and starting all over again. All this is complicated by the fact I won't know where I fit until I place my deposit. I know once the deposit is down, I won't be asking for a refund (unless production is severly delayed...at which point I am renting) but I don't know for sure when the funds will be avalible...politics I won't go into.
Any words of advice or comfort?