mike falconer
Member
- Joined
- Feb 27, 2008
- Messages
- 19
- Reaction score
- 0
- Points
- 0
I have a good deal of 4k red footage shot at 24fps that needs to be mastered out at 29.97 for broadcast.
Back in the CS4 days I was advised to run each R3D clip through AE with 3:2: pulldown added before editing. I was also told that AE did a better job than AME.
Now, with CS5.5, I'm wondering if Ppro can handle this conversion from the timeline? Or, should I "interpret footage" on the timeline before editing?
Any advice would be gratefully accepted. This issue confuses the hell out of me.
Back in the CS4 days I was advised to run each R3D clip through AE with 3:2: pulldown added before editing. I was also told that AE did a better job than AME.
Now, with CS5.5, I'm wondering if Ppro can handle this conversion from the timeline? Or, should I "interpret footage" on the timeline before editing?
Any advice would be gratefully accepted. This issue confuses the hell out of me.