Nathan Troutman
Well-known member
The more I look at it, this 8-core update from Apple is nothing more than a marketing stunt or something they're doing just because they can. They have an exclusive for a few weeks on the 3GHz chips so they're going to use them. I would still bet we see a bigger Mac Pro update in another 2 to 3 months as Apple will do doubt ship newer systems with the upcoming Stoakley/Seaburg chipset. I wouldn't even be surprised if such a system is *announced* at NAB. The updated Intel chipset gives 44 PCI-E lanes, PCI-E 2.0, faster FSB options and a more efficient memory controller. Intel's new chipset should be shipping to OEMs by the end of April to sometime in May. In typical Apple fashion, that translates to late June, maybe even mid July for incorporation into a system. Intel will be shipping updated CPU models by then too.
I'm eager to see what Apple comes out with when the real update hits. But I won't buy until they do something to fix the dismal graphics options.
Amen to everything you said. But, if you look at Apple's G5/Mac Pro upgrade cycle they've never broken the normal timeline before. However here's the insider's quote, "The last Mac Pro updates only introduced an 8-Core Mac Pro, leaving the rest of the line untouched. Updates to the regular Mac Pros may still be coming." Let's hope so. The shortest update cycle was around 5 months with the longest being about 10 months. The most frustrating thing about this "upgrade" is it comes after a fairly long cycle. We should've seen more. I hope it's coming and maybe it is since Apple might've needed to capitalize on the exclusive they had on the Intel 3.0 Quad Xeons. But after 8 months Apple can't coordinate a real upgrade to the entire line with the release of the new Intel chip? I'd love to know what's going on. Maybe someone forgot to order the new video cards from Nvidia:help: