Nathan DuMoulin
Well-known member
The Red Store shows the brain is now delayed till March. The month that I just spent impatiently waiting has been nullified. Reset back to the original five month countdown. 
I understand things take time, but with the R&D already completed with Weapon and the existing Dragon sensor, im very surprised that Raven is delayed so soon.
EDIT: As pointed out by Phil, this is likely due to the sensor upgrade to 4.5K.
EDIT 2: As Jordan discovered, we're now allowed to switch between the packages and brain-only option without losing our place in the queue. For those of us who opted to forgo the package savings to get the brain a month earlier can now choose the package if desired. Makes things a bit easier to stomach.
I understand things take time, but with the R&D already completed with Weapon and the existing Dragon sensor, im very surprised that Raven is delayed so soon.
EDIT: As pointed out by Phil, this is likely due to the sensor upgrade to 4.5K.
EDIT 2: As Jordan discovered, we're now allowed to switch between the packages and brain-only option without losing our place in the queue. For those of us who opted to forgo the package savings to get the brain a month earlier can now choose the package if desired. Makes things a bit easier to stomach.
Last edited: