Chad Bonanno
Well-known member
- Joined
- May 12, 2008
- Messages
- 507
- Reaction score
- 0
- Points
- 0
- Age
- 44
- Location
- Hollywood , Ca
- Website
- www.chadbonanno.com
Hello all,
I am running into an issue with my XML coming out of Premiere 5.5 into RedCinePro-X.
The sequence and R3ds import just fine, but the clips INs and OUTs points are ALL screwed up. I can see my edit is 5 minutes long, like the original, but hardly ANY of the clips have their original IN and OUT points.
I shot at a base timecode of 23.97 and shot everything at 48fps, so I am having to reTime every clip. Is there any workout here? I feel like I am running into a retiming issue that RedCine is not picking up. I only used Premiere SPEED/DURATION to change the speed of the clips, no official time remapping.
Thanks in advance
I am running into an issue with my XML coming out of Premiere 5.5 into RedCinePro-X.
The sequence and R3ds import just fine, but the clips INs and OUTs points are ALL screwed up. I can see my edit is 5 minutes long, like the original, but hardly ANY of the clips have their original IN and OUT points.
I shot at a base timecode of 23.97 and shot everything at 48fps, so I am having to reTime every clip. Is there any workout here? I feel like I am running into a retiming issue that RedCine is not picking up. I only used Premiere SPEED/DURATION to change the speed of the clips, no official time remapping.
Thanks in advance