Christoffer Glans
Well-known member
I'm trying to calculate the speed of a clip so I can return a 25 fps clip to 30 fps which it was shot in. In Premiere and Avid there's a base-speed of 100 (percent) and I'm not sure if my math is correct.
30 / 25 = 1,2
Therefore, I set the new speed on 120. But when doing so I get the lost frames and problems you get with a speed that isn't correct towards the base time. So what is going on?
30 / 25 = 1,2
Therefore, I set the new speed on 120. But when doing so I get the lost frames and problems you get with a speed that isn't correct towards the base time. So what is going on?