donovangreene@mac.com
Member
- Joined
- Oct 29, 2008
- Messages
- 20
- Reaction score
- 0
- Points
- 0
Working on a project that was shot at 25fps with a timebase of 23.98.
The project is now going to be edited abroad, so I need to change the timebase to 25 frame.
How can I export the original footage, to a 25 frame timeline. RedCine? Compressor?
Thanks for your help
The project is now going to be edited abroad, so I need to change the timebase to 25 frame.
How can I export the original footage, to a 25 frame timeline. RedCine? Compressor?
Thanks for your help