Nadeem Soumah
Member
well i put myself in quite a bind. I REALLY need help with this one!!!!
I shot a film on red in 4k using 3k and 2k sometimes for slomo. In premiere I opened a 512 sequence then had to sync my audio so in the timeline synched all my shots on a single video channel in the timeline. lets call this the "syching sequence"
I then opened a second 512 sequence my "editing sequence" and put in and out points from sequence 1 the "synching sequecne" everytime i needed a shot and edited the whole short that way. That way i could bring video AND audio synched shots into the editing sequence. So basically my "editing sequence" was reading from my "synching sequence"
Once all was done I then opened a 4k sequence and copied and pasted the audio/video from my 512 "editing sequence" into that for final render, changed the source settings of the footage in the bin accordingly. The problem here is that now my 4k sequence is not reading files from the actual bin or actual footage so its only interpreting it as 512 footage from the "synching sequence"
Normally for music videos I edit in a 512 sequence, copy and paste into a 4k sequence then change the source settings and my 4k sequence reads the files as 4k footage for CC and export.
I'm on a VERY VERY tight deadline so will not have time to reedit this. how can I go about having my 512 sequence copied and pasted into a 4k sequence to be interpreted as 4k. I've tried EVERYTHING i could think of and REALLY dont know what to do. I obviously dont want to be stuck with 512 footage for CC/export and also wont have time to reedit the whole film as the client has me on a very tight deadline.
Please help as i'm at a loss here!!!! If theres anything confusing about my description of my workflow please let me know and i'll try to make clear what i did.
thanks in advance.
I shot a film on red in 4k using 3k and 2k sometimes for slomo. In premiere I opened a 512 sequence then had to sync my audio so in the timeline synched all my shots on a single video channel in the timeline. lets call this the "syching sequence"
I then opened a second 512 sequence my "editing sequence" and put in and out points from sequence 1 the "synching sequecne" everytime i needed a shot and edited the whole short that way. That way i could bring video AND audio synched shots into the editing sequence. So basically my "editing sequence" was reading from my "synching sequence"
Once all was done I then opened a 4k sequence and copied and pasted the audio/video from my 512 "editing sequence" into that for final render, changed the source settings of the footage in the bin accordingly. The problem here is that now my 4k sequence is not reading files from the actual bin or actual footage so its only interpreting it as 512 footage from the "synching sequence"
Normally for music videos I edit in a 512 sequence, copy and paste into a 4k sequence then change the source settings and my 4k sequence reads the files as 4k footage for CC and export.
I'm on a VERY VERY tight deadline so will not have time to reedit this. how can I go about having my 512 sequence copied and pasted into a 4k sequence to be interpreted as 4k. I've tried EVERYTHING i could think of and REALLY dont know what to do. I obviously dont want to be stuck with 512 footage for CC/export and also wont have time to reedit the whole film as the client has me on a very tight deadline.
Please help as i'm at a loss here!!!! If theres anything confusing about my description of my workflow please let me know and i'll try to make clear what i did.
thanks in advance.