Curran Giddens
Well-known member
- Joined
- Jan 3, 2007
- Messages
- 4,452
- Reaction score
- 0
- Points
- 36
- Age
- 46
- Location
- Great Barrington, MA
- Website
- www.solarsystemstudio.com
Finally, after more then 2 years of waiting, RED ONE #561 is here!
The Red cart was shipped a couple of days before on a wooden pallet. After unscrewing a couple of brackets by hand with a screwdriver, I thought this will take way too long. So I decided to use a crowbar and a hammer to open the crate. It made quick work to pop open, snapping in half a couple of screws in the process. I forgot that the carbon fiber rods that I ordered for the top aren't yet available so I couldn't add the top mount and side rails. I just put in an order for the 12" steel rods. I will post some more pics as soon as I get everything all set up.
The Red cart was shipped a couple of days before on a wooden pallet. After unscrewing a couple of brackets by hand with a screwdriver, I thought this will take way too long. So I decided to use a crowbar and a hammer to open the crate. It made quick work to pop open, snapping in half a couple of screws in the process. I forgot that the carbon fiber rods that I ordered for the top aren't yet available so I couldn't add the top mount and side rails. I just put in an order for the 12" steel rods. I will post some more pics as soon as I get everything all set up.