Uli Kunkel
Active member
- Joined
- May 20, 2008
- Messages
- 40
- Reaction score
- 0
- Points
- 0
I am trying out Clipfinder for the first time and I've played with various settings to test out how long it takes to convert my red footage into the format that I want to edit with. I'm noticing on the batch process that it's taking a very long time to process footage that, if converted using the Log and Transfer method in Final Cut, would have taken far less time.
I'm working on a Dual 3gHz Dual-Core Mac Pro with 6GB of RAM.
Settings in Clipfinder are as follows:
Output Format: Quicktime
Debayer Resolution: HD+ (high)
Codec: ProRes HQ
Scale: 1920x1080 (I tested this without scaling and it didn't change the render time by much)
Tasks: 2
Cores/Tasks: 4
I have played around with the tasks and core/tasks settings and it hasn't made much difference.
I've read that some people have had a better experience with Red Rushes.
Anyone have any ideas? Could I be doing something wrong?
Thanks.
Uli
I'm working on a Dual 3gHz Dual-Core Mac Pro with 6GB of RAM.
Settings in Clipfinder are as follows:
Output Format: Quicktime
Debayer Resolution: HD+ (high)
Codec: ProRes HQ
Scale: 1920x1080 (I tested this without scaling and it didn't change the render time by much)
Tasks: 2
Cores/Tasks: 4
I have played around with the tasks and core/tasks settings and it hasn't made much difference.
I've read that some people have had a better experience with Red Rushes.
Anyone have any ideas? Could I be doing something wrong?
Thanks.
Uli