Dominic Domiac
Member
- Joined
- Feb 23, 2009
- Messages
- 11
- Reaction score
- 0
- Points
- 0
Hello, I am an experienced DV editor who has been contracted to edit a feature shot on the Red. The director and producers insist that I use CS4 for the entire workflow.
This is my first post-production project with Red footage. The footage is all 4k. To complicate matters, the sound files are all separate from the footage (this is my first project where the audio was not embedded in the video). However, it doesn't seem that Premiere can read the timecode from the wav files, and there seems to be no way that I can marry the footage and the sound files without bringing them into some sort of sequence.
Should I begin my project with creating 1k sequences for every single shot, syncing the footage within each individual sequence, and then subsequently editing using these "synced sequences" as if they were raw footage? Is this going to cause complications down the line that I might not yet see?
I am really disappointed that in using this sort of workflow that I will not be able to use sub-clips, as you cannot create a subclip from a sequence.
There are roughly 475 shots (with corresponding separately-recorded audio) for a total of about 14 hours worth of raw footage to this project.
Thanks for your time. I apologize if some of my sentences are hard to read, as I am not a native English speaker.
This is my first post-production project with Red footage. The footage is all 4k. To complicate matters, the sound files are all separate from the footage (this is my first project where the audio was not embedded in the video). However, it doesn't seem that Premiere can read the timecode from the wav files, and there seems to be no way that I can marry the footage and the sound files without bringing them into some sort of sequence.
Should I begin my project with creating 1k sequences for every single shot, syncing the footage within each individual sequence, and then subsequently editing using these "synced sequences" as if they were raw footage? Is this going to cause complications down the line that I might not yet see?
I am really disappointed that in using this sort of workflow that I will not be able to use sub-clips, as you cannot create a subclip from a sequence.
There are roughly 475 shots (with corresponding separately-recorded audio) for a total of about 14 hours worth of raw footage to this project.
Thanks for your time. I apologize if some of my sentences are hard to read, as I am not a native English speaker.