David Wyatt
Well-known member
- Joined
- Apr 10, 2007
- Messages
- 887
- Reaction score
- 0
- Points
- 16
- Location
- London
- Website
- www.davidwyattdop.com
I've got a feeling this is going to open up a can of worms...but anyway...
I've found it's useful when pitching the Red to potential clients (particularly feature clients) to be able to give a rough figure for what a traditional film costs (i.e. stock + negative processing) since these are costs the Red camera doesn't have and therefore the supposed saving can be spent elsewhere or go "on the screen" (this is the enticing bit for a producer of course). So without causing a flame war can we ascertain what an average low budget indie film would cost in terms of stock & processing (maybe even things like telecine costs for rushes etc) - I'll start the ball rolling by completely guessing that 35mm stock & processing comes to about £0.50/ft which would be a cost of £50,000 for an entire 100,000ft feature (4-perf for arguments sake). That's a cost the Red doesn't have, so that's an instant saving but are there any more savings to add (e.g. telecine) and how much would they typically be (e.g. telecine suite = £400/hour(?) - how long to telecine a 100,000ft film?) - forgive my post ignorance but pricing isn't something that usually crosses my radar. Conversely are there any extra significant post-production costs the Red has that the film workflow wouldn't have? It might also be interesting to also compare it to the cost of scanning 35mm film (which is even more, right?)
I know this is verging on "how long is a piece of string" territory but I think if we could work out a consensus of typical costs it would be a useful tool for all of us to make the big sell particularly to features producers, many of whom are initially a bit reticent about using the Red.
I've found it's useful when pitching the Red to potential clients (particularly feature clients) to be able to give a rough figure for what a traditional film costs (i.e. stock + negative processing) since these are costs the Red camera doesn't have and therefore the supposed saving can be spent elsewhere or go "on the screen" (this is the enticing bit for a producer of course). So without causing a flame war can we ascertain what an average low budget indie film would cost in terms of stock & processing (maybe even things like telecine costs for rushes etc) - I'll start the ball rolling by completely guessing that 35mm stock & processing comes to about £0.50/ft which would be a cost of £50,000 for an entire 100,000ft feature (4-perf for arguments sake). That's a cost the Red doesn't have, so that's an instant saving but are there any more savings to add (e.g. telecine) and how much would they typically be (e.g. telecine suite = £400/hour(?) - how long to telecine a 100,000ft film?) - forgive my post ignorance but pricing isn't something that usually crosses my radar. Conversely are there any extra significant post-production costs the Red has that the film workflow wouldn't have? It might also be interesting to also compare it to the cost of scanning 35mm film (which is even more, right?)
I know this is verging on "how long is a piece of string" territory but I think if we could work out a consensus of typical costs it would be a useful tool for all of us to make the big sell particularly to features producers, many of whom are initially a bit reticent about using the Red.