Welcome to our community

Be a part of something great, join today!

  • Hey all, just changed over the backend after 15 years I figured time to give it a bit of an update, its probably gonna be a bit weird for most of you and i am sure there is a few bugs to work out but it should kinda work the same as before... hopefully :)

Media % to Footage Remaining Calculation

Jamie Metzger

Well-known member
Joined
Mar 17, 2008
Messages
123
Reaction score
0
Points
0
Age
42
Website
www.linkedin.com
Correct me if I am wrong:

RED Drive = 320GB
4k2:1 @ 24fps at Redcode 28 = 180 minutes at 320GB
180 (minutes) / 100 (% scale) = 1.8
85% (left on the Media meter) * 1.8 = 153 minutes remaining
180 minutes - 153 = 27 minutes have all ready been recorded

Now this varies based on scene detail, and some other options, but generally I think this is pretty close.

Jamie
 
Why would me posting the footage matter? Either way, I'm doing a test that wont be done for another 2 hours, so I can't post right now anyways...And it's nothing exciting to look at.
 
Back
Top